BEEHIVE
BRIX & BOARDS
Open a job entry

Brick by brick.
Board by board.

Home remodeling across the Wasatch Front and Tooele Valley. One craftsman on your job from the first walkthrough to the last coat — no crews of strangers, no handoffs.

Request a walkthrough Free on-site. Written quote in 72 hours.
Serving Salt Lake Co.Utah Co.Davis Co.Tooele Co.

Family-run · Est. in the Beehive State

The brix hold it up. The boards make it home.

Masonry and carpentry are two trades. Most remodels need both — so most remodels get two subcontractors, two schedules, and one homeowner stuck in the middle. Here, the same hands do both, and the job runs like one job.

Trades under one roofMasonry + carpentry
Who shows upThe owner
Quote formatFixed, in writing
Typical projects$8k – $80k

The job ledger

Every project gets an entry. Every entry gets finished.

Recent work, logged the old way: scope, weeks, done.

№ 2607-K
Logged · Spring
Boards

Farmhouse kitchen, taken to the studs

  • Demo & haul-offweek 1
  • Custom island & cabinet installweeks 2–4
  • Trim, tile & finishweeks 5–6
Done right
Finished farmhouse kitchen with wood island, white cabinets, and range
Result · kitchen remodel, 6 weeks
№ 2603-K
Logged · Winter
Brix

Mountain kitchen with beams & tile

  • Structural beam wrapweek 1
  • Full-height tile & hood surroundweeks 2–3
  • Cabinet & counter installweeks 4–6
Finished kitchen with navy cabinets, wood ceiling beams, and patterned tile backsplash
Result · kitchen remodel, 6 weeks
№ 2601-B
Logged · Winter
Boards

Basement, framed to family room

  • Framing & subfloorweeks 1–2
  • Drywall, paint & flooringweeks 3–5
  • Stair rail & finish carpentryweek 6
Finished basement family room with sectional, kitchenette, and new flooring
Result · basement finish, 6 weeks
№ 2598-B
Logged · Fall
Brix

Guest bath, penny tile & brass

  • Tear-out & plumbing rough-inweek 1
  • Penny tile shower & wallweeks 2–3
  • Vanity, mirror & fixturesweek 4
Finished bathroom with penny tile walls, brass fixtures, and walnut vanity
Result · bath remodel, 4 weeks

The middle weeks

The part nobody photographs, done as carefully as the part everybody does.

Mud, tape, screed, and dust control. It's the unglamorous middle of a remodel that decides whether the finish lasts — and it's where corner-cutting hides. You're welcome to look over my shoulder the whole way.

Walls · drywall & finish
Floors · level before beautiful

How a job runs

Three steps. No surprises on step four.

Entry 1

The walkthrough

I come to your home, look at the real thing, and listen. Free, no obligation, and you'll get straight answers about what's worth doing.

Entry 2

The written quote

A fixed price and a week-by-week plan, in writing, within 72 hours. The number I quote is the number you pay.

Entry 3

One craftsman, start to finish

The person who quoted your job is the person swinging the hammer. Same truck in the driveway until the punch list reads zero.

The maker

A family shop, busy as the state it's named for.

Beehive Brix and Boards is a family-run remodeling shop working the Wasatch Front and Tooele Valley. Decades of hands-on trade work, one job at a time — with a grandson apprenticing in the summers and plans to grow a small crew the same way the work is done: carefully.

Until then, the schedule stays honest. A one-craftsman shop can't take every job — which is exactly why the ones it takes get finished right.

Site sweptEvery night
Calls returnedSame day
Change ordersIn writing
Subcontractor rouletteNever

In the neighbors' words

Signed off, in their own words.

Sample entries, shown as they will appear · real reviews are logged here unedited after every finished job

The man who bid our kitchen was the man in our kitchen, every day, for six weeks. He caught a subfloor problem the bigger outfit's bid never mentioned, told us the real cost up front, and the number never moved.
R. & S. Hansen · Stansbury ParkJob № 2607-K
Our basement went from bare studs and extension cords to the room we live in every evening. The site was swept before he left, every single day, and my kids were greeting him by name by week two.
M. Okafor · SandyJob № 2601-B
He said four weeks for the guest bath and it took four weeks. The penny tile lines are dead straight, and when a fixture showed up scratched he flagged it and swapped it before we ever saw the box.
J. & T. Larsen · GrantsvilleJob № 2598-B

Open a job entry

Tell me about your project.

You'll hear back within one business day.

Entry received — you'll hear back within one business day.